Galvanizing basins production at the plant of AGP LLC
Khirdalan Metal Constructions LLC and “AGP” LLC signed an Agreement on construction of large galvanizing basins as well as fabrication of large size bearings and other steel structures at a galvanizing plant on 21.07.2015.
Two plants of Khirdalan Metal Constructions LLC started to carry out steel structure works of 300 tonnes. Khirdalan Steel Structures Plant and Minghachevir Machine Building Plant delivered this Project with a high degree of certainty and commitment.
At the preliminary stage, our engineer-constructors prepared the 3D model of the Project. Production process started following the preparation of the model and the drawings. After the sandblasting and painting, the welding works were applied. The process continued with the cutting of the details by means of saws and plasmas. Following the cutting, the process proceeded in punching machines for drilling holes as per defined diameters. During these procedures, the quality of the done works was always under the control. Later the materials made for the reconstruction Project were loaded on trucks and taken to the place deemed for the construction of the Project. Installation works were started with start-of-art and multifunctional machines (cranes, etc.). The installations were fixed with welding and connections. The project entrusted us was successfully delivered with a high degree of certainty and commitment as well as handed over within the time agreed with "AGP" LLC.
Other sections